Key techniques and risk management for the application of the Pile-Beam-Arch (PBA) excavation method: a case study of the Zhongjie subway station

桩-梁-拱(PBA)开挖方法应用的关键技术及风险管理:以中街地铁站为例

阅读:1

Abstract

The design and construction of shallow-buried tunnels in densely populated urban areas involve many challenges. The ground movements induced by tunneling effects pose potential risks to infrastructure such as surface buildings, pipelines, and roads. In this paper, a case study of the Zhongjie subway station located in Shenyang, China, is examined to investigate the key construction techniques and the influence of the Pile-Beam-Arch (PBA) excavation method on the surrounding environment. This case study discusses the primary risk factors affecting the environmental safety and summarizes the corresponding risk mitigation measures and key techniques for subway station construction using the PBA excavation method in a densely populated urban area.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。