Evaluation of the Deadly Liver Mob program: insights for roll-out and scale-up of a pilot program to engage Aboriginal Australians in hepatitis C and sexual health education, screening, and care

对“致命肝脏行动”项目的评估:为推广和扩大试点项目规模提供见解,该项目旨在让澳大利亚原住民参与丙型肝炎和性健康教育、筛查和护理。

阅读:1

Abstract

BACKGROUND: Deadly Liver Mob (DLM) is a peer-driven, incentivised health promotion program aimed at increasing understanding of hepatitis C, promoting harm reduction in relation to injecting drug use, and linking participants to screening for hepatitis C, other blood borne viruses and sexually transmissible infections among Aboriginal people in Western Sydney, NSW. This paper presents the evaluation of a pilot study examining the acceptability of the program as a first step of a scalability assessment. METHODS: Deadly Liver Mob operated in co-located needle and syringe programs and sexual health clinics in two sites: (Site 1: two and a half years for 2 days/week; Site 2: 1 year for 1 day per week). Comparisons were made of the proportion of Aboriginal clients (Site 1) and occasions of service provided to Aboriginal clients (Site 2) in the 12 months prior and post-introduction of DLM. Interviews were conducted with 13 staff involved in delivery of DLM and with 19 clients. RESULTS: A total of 655 and 55 Aboriginal clients, respectively, attended Site 1 and Site 2 for health education. The proportion of Aboriginal clients attending both sites was significantly higher during the DLM compared with prior to its implementation. Of those attending for health education, 79 and 73%, respectively, attended screening following education. DLM clients strongly endorsed the program. Some staff were concerned about workforce capacity to effectively engage Aboriginal clients with multiple and complex needs, managing the differing aims of the participating services involved, and about offering of incentives for attendance at health services. CONCLUSION: While acceptability was high among staff and clients and preliminary results show high engagement with Aboriginal communities, this evaluation of a pilot program raises some issues to consider in scale up of DLM to other sites. The initiation of additional DLM sites should address issues of alignment with governing strategies and workforce capacity.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。