Drilling and blasting designs for parallel hole cut and V-cut method in excavation of underground coal mine galleries

地下煤矿巷道开挖中平行孔切割法和V形切割法的钻孔爆破设计

阅读:1

Abstract

The Karadon mine, where field studies were carried out, is located in the north west of Turkey and is considered to be a highly gaseous coal mine. Explosives and ignition systems used in underground coal mines are determined by laws, statutes, regulations and strict rules. Restrictions arising from legal requirements, such as restrictions on charging and stemming lengths and blasting agents to be used, make the use of well-known tunnel blasting techniques difficult or sometimes not possible. In such cases, the designs made with the equations given in the literature must be revised and rearranged. The objective of this study is to recommend solutions to the blasting difficulties that are encountered in gaseous underground coal mines in which there are limitations arising from legal requirements. This study summarizes and analyses the blasting practices currently employed at Karadon mine along with their disadvantages. New blasting designs were then made using the methods suggested in the literature, and these designs were revised according to legal requirements. By keeping the charge concentration constant relative to its original value, the burden and spacing distances were adjusted. As a result of this study, it has been seen that rearrangement by keeping the charge concentration constant compared to its original value is an appropriate engineering solution.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。