Research on production capacity planning method of open-pit coal mine

露天煤矿产能规划方法研究

阅读:1

Abstract

Reasonable production capacity is related to the economic benefits of an open-pit coal mine. This study analyzes the relationship between the working face length, the annual advancing speed and the production capacity. It constructs a production capacity function relationship model. Take the Baorixile open-pit coal mine as an example. The remaining unmined parts are divided into four regions, and the range of production capacity in each region is analyzed by the established model and the determined respectively. On this basis, three mining district division plans are proposed. By analyzing and comparing the stripping ratio, mining life of the district, fault influence, difficulty of transition connection in the mining districts, the convenience of transportation system layout and other indexes of each plan, Plan 3 is determined to be the optimal plan. The production capacity planning results of each mining district in this plan are as follows: the production capacity of the 3rd mining district is 30-35 Mt/a; the production capacity of the 4th mining district in Region 1 is 20-31 Mt/a, and the production capacity in Region 2 is 24-33 Mt/a; the production capacity of the 5th mining district is 20-27 Mt/a.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。