During a 12-year period (2011-23), the number of staff in the Clinical Engineering (CE) Department at the Children's Hospital of Eastern Ontario (CHEO) increased from five to more than 20 biomedical equipment technicians/technologists. However, despite this increase in staff, processes did not evolve and procedures that used modern technological and shipping advances were not implemented. The absence of standardized procurement and inventory processes for parts created discrepancies between on-hand inventory and the computerized maintenance management system (CMMS). Owing to inaccurate CMMS information and unsystematic parts documentation, time and money were wasted. This situation led to a lack of confidence in CMMS data, causing staff disengagement, loss of accountability, and limited parts tracking. The current article describes a project that used Lean methodologies and use of the define, measure, analyze, improve, and control structure, including tools such as interviews, a survey, process mapping, and Gemba walks, to create a list of prioritized problems. A total of 16 problems were formulated, four of which were identified as prerequisites to be implemented regardless of prioritization. The four prerequisites described the scope of each problem and potential solutions. The goal of this process was to create a workflow that could save time and money while improving the morale of stakeholders involved in the parts procurement and inventory process.
Finding the Waste: Parts Inventory Analysis Using Lean Methodology.
阅读:12
作者:Janvier Marie-Ange, Ibey Andrew A M, Madhusudan Kajal, Al-Tahir Ishtar, Asbil Mark R, Greenwood Kim
| 期刊: | Biomedical Instrumentation and Technology | 影响因子: | 0.000 |
| 时间: | 2024 | 起止号: | 2024;58(4):72-80 |
| doi: | 10.2345/0899-8205-58.4.72 | ||
特别声明
1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。
2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。
3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。
4、投稿及合作请联系:info@biocloudy.com。
