Surgery scheduling heuristic considering OR downstream and upstream facilities and resources

考虑手术室下游和上游设施及资源的手术排程启发式算法

阅读:3

Abstract

BACKGROUND: Surgical theater (ST) operations planning is a key subject in the healthcare management literature, particularly the scheduling of procedures in operating rooms (ORs). The OR scheduling problem is usually approached using mathematical modeling and made available to ST managers through dedicated software. Regardless of the large body of knowledge on the subject, OR scheduling models rarely consider the integration of OR downstream and upstream facilities and resources or validate their propositions in real life, rather using simulated scenarios. We propose a heuristic to sequence surgeries that considers both upstream and downstream resources required to perform them, such as surgical kits, post anesthesia care unit (PACU) beds, and surgical teams (surgeons, nurses and anesthetists). METHODS: Using hybrid flow shop (HFS) techniques and the break-in-moment (BIM) concept, the goal is to find a sequence that maximizes the number of procedures assigned to the ORs while minimizing the variance of intervals between surgeries' completions, smoothing the demand for downstream resources such as PACU beds and OR sanitizing teams. There are five steps to the proposed heuristic: listing of priorities, local scheduling, global scheduling, feasibility check and identification of best scheduling. RESULTS: Our propositions were validated in a high complexity tertiary University hospital in two ways: first, applying the heuristic to historical data from five typical ST days and comparing the performance of our proposed sequences to the ones actually implemented; second, pilot testing the heuristic during ten days in the ORs, allowing a full rotation of surgical specialties. Results displayed an average increase of 37.2% in OR occupancy, allowing an average increase of 4.5 in the number of surgeries performed daily, and reducing the variance of intervals between surgeries' completions by 55.5%. A more uniform distribution of patients' arrivals at the PACU was also observed. CONCLUSIONS: Our proposed heuristic is particularly useful to plan the operation of STs in which resources are constrained, a situation that is common in hospital from developing countries. Our propositions were validated through a pilot implementation in a large hospital, contributing to the scarce literature on actual OR scheduling implementation.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。