DEVELOPMENT OF A COMPLEX MULTIPLE SCHEDULE IN THE CHIMPANZEE

黑猩猩复杂多重作息时间表的形成

阅读:1

Abstract

The development of chimpanzee behavior on a four-component, three-lever multiple schedule is described. Component schedules included the Sidman avoidance procedure with a concurrent discriminated avoidance schedule on a second lever, fixed ratio performance for food, differential reinforcement of low rate for water requiring a dual response chain, and a symbol discrimination task for continuous food reinforcement using three levers. The avoidance component of this schedule was employed during the January 31, 1961 suborbital space flight of the chimpanzee "Ham." On November 29, 1961, the chimpanzee "Enos" performed on the multiple schedule during three orbits around the earth in a Mercury capsule.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。