Multiple and concurrent schedule performance: independence from concurrent and successive schedule contexts

多任务并行调度性能:独立于并行和连续调度上下文

阅读:1

Abstract

Six pigeons were trained on multiple variable-interval schedules and performance was measured in the presence or absence of another variable-interval schedule (the common schedule) arranged concurrently with both components. Manipulations included varying the rate of reinforcement on the common schedule, leaving the common schedule unchanged while the components of the multiple schedule were varied, varying the multiple schedule components in the absence of the common schedule, and varying one component of the multiple schedule while the other component and the common schedule were unchanged. The normal rate-increasing and rate-decreasing effects of reinforcement rate increase were found, except that changing one multiple schedule component did not affect the response rate in the successively available common schedule component. Both concurrent and multiple schedule performance undermatched obtained reinforcement-rate ratios, but the degree of undermatching in multiple schedules was reliably greater. Allocation of responses between multiple schedule components was unaffected by the concurrent availability of reinforcement, and allocation of responses between concurrent schedules was unaffected by the successive availability of different reinforcement rates.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。