Matching, delay-reduction, and maximizing models for choice in concurrent-chains schedules

并发链调度中选择的匹配模型、延迟减少模型和最大化模型

阅读:1

Abstract

Models of choice in concurrent-chains schedules are derived from melioration, generalized matching, and optimization. The resulting models are compared with those based on Fantino's (1969, 1981) delay-reduction hypothesis. It is found that all models involve the delay reduction factors (T - t2L) and (T - t2R), where T is the expected time to primary reinforcement and t2L, t2R are the durations of the terminal links. In particular, in the case of equal initial links, the model derived from melioration coincides with Fantino's original model for full (reliable) reinforcement and with the model proposed by Spetch and Dunn (1987) for percentage (unreliable) reinforcement. In the general case of unequal initial links, the model derived from melioration differs from the revised model advanced by Squires and Fantino (1971) only in the factors affecting the delay-reduction terms (T - t2L) and (T - t2R). The models of choice obtained by minimizing the expected time to reinforcement depend on the type of feedback functions used. In particular, if power feedback functions are used, the optimization model coincides with that obtained from melioration.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。