Demystifying the hospital information system/radiology information system integration process

揭秘医院信息系统/放射信息系统集成过程

阅读:1

Abstract

Most organizations planning to implement picture archiving and communications systems (PACS) are aware of the need to integrate the hospital information system (HIS) and radiology information system (RIS) with the PACS, yet few are acutely aware of the challenges associated with this requirement. This report highlights the results of collaborative efforts between Children's Hospital Medical Center-Cincinnati (CHMC) applications specialists with expertise in the HIS and CHMC information system, radiology staff familiar with the enterprise and radiology workflow and data flow requirements; and General Electric integration engineers familiar with the SMS HIS and RIS, and GE PACS. CHMC received Board approval, including full funding of the entire PACS project, in October 1998. An aggressive time frame for installation was established, as CHMC's PACS leadership committed to the selection, design, and implementation of PACS and computed radiography (CR) within 18 to 20 months. CHMC selected GE (Milwaukee, WI) as its PACS vendor in July 1999, and began its implementation in November 1999. We will present the four-stage integration process undertaken at CHMC: (1) planning the integration effort, (2) designing the Interface, (3) building the interface, and (4) testing the Interface.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。