Ecological resource potential

生态资源潜力

阅读:1

Abstract

The ecological resource potential (ERP) method allows to calculate the amount of one material that can potentially be produced within Earth system boundaries, if no other anthropogenic activity would take place. It indicates the uppermost potential of one resource extracted, processed and disposed after use with a specific set of technologies and a defined probability of violating Earth system boundaries. This method is an adaption of the ecological resource availability (ERA) method, which calculates the amount of a resource that can be produced within an allocated share of the global boundaries, i.e. when considering all other anthropogenic activities. While more realistic, its allocation can be done in multiple ways and based on a variety of different objectives, which requires scenario modelling. The ERP method, in contrary, only requires information on environmental impacts from resource extraction, processing, and final disposal. The customization of the original ERA method comprises:•Omitting all steps for allocating global boundaries to single resources or resource segments.•Changing the calculation procedure so that ERP is calculated for each resource separately.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。