Adapting the design of the ongoing RAMPART trial in response to external evidence: An example for trials which take many years to run and report

根据外部证据调整正在进行的 RAMPART 试验的设计:一个需要多年运行和报告的试验的案例

阅读:1

Abstract

Clinical trials to establish the efficacy of new agents in the adjuvant cancer setting typically take many years to complete. During that time, external factors can impact recruitment and reporting plans. An example is a new standard of care becoming available during the recruitment period. In this paper we describe how we modified the design of the RAMPART trial (NCT03288532) which was set up to investigate immune checkpoint inhibitor therapy in the adjuvant renal cancer setting. The trial had been initiated when no globally accepted adjuvant strategy after nephrectomy existed. A subsequent change in the standard of care for many patients with early renal cancer meant it was no longer feasible to continue to recruit. We needed to find a way to maximise the contribution that RAMPART participants could make to the evidence base for immune checkpoint inhibitor therapy without introducing bias or detriment to the integrity of the trial results. We describe how we agreed and incorporated all design and timeline changes while remaining blinded to accumulating data within the trial, thus protecting the reliability of the future results. We share details of our design modifications to guide others who may have similar experiences, particularly as more agents and combinations of agents are developed and investigated in similar adjuvant settings.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。