Study on fracture development and progressive failure characteristics of downstream dam-type expansion tailings reservoir

下游坝式扩容尾矿库裂缝发育及渐进破坏特征研究

阅读:2

Abstract

With the economic development and industrialization, the increasingly accumulated tailings ponds in China have become a great risk. Due to the difficulty of selecting proper site for a new reservoir in Yunnan, a sub-dam was built at the downstream original reservoir. This study explored the fracture development and progressive failure characteristics of the tailings reservoir area after capacity expansion based on a similarity experiment and the numerical simulation. The results showed that the primary cracks in the reservoir area were more than those at the top of the sub-dam. With the increase of the upper load, the primary cracks further developed and penetrated the whole sub-dam top, and the sub-cracks were then produced under the concentrate stress of the primary cracks. After the further development of the sub-cracks, the secondary cracks parallel to the primary cracks were formed on the outer slope of the sub-dam. The progressive failure of a tailings dam can be summarized as: the maximum shear stress was firstly generated at the toe of the slope or the top of the dam which then extended to the top of the sub-dam in the form of a curve and finally formed the failure surface by connecting with the primary fracture of the tensile plastic zone at the top of the dam. The study also found that in the process of tailings accumulation in the new reservoir area, tailings would form "back pressure slope protection" at the initial dam of the original reservoir, which not only effectively delayed the occurrence of shear failure, but also inhibited the generation and penetration of tensile plastic zone.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。