Abstract
Concrete bridge structures require reinforcement, as their performance deteriorates over time. In this regard, this study evaluated the effect of additional prestressing using fiber-reinforced polymers (FRPs) and strands applied to a demolished, deteriorated bridge. In particular, specimens were prepared for a bridge subjected to non-, near-surface mounted (NSM), and external prestressing (EP) strengthening to evaluate the stiffness and safety of the structure. In the 200-400 kN load range, the EP method exhibited the highest stiffness (15 kN/mm), followed by non-strengthening (8.5 kN/mm) and the NSM method (5.45 kN/mm). The EP method increased the stiffness by approximately two times; however, the NSM method decreased the stiffness by 0.6 times. In the 400-800 kN load range, the EP and NSM methods yielded stiffness values of 2.58 and 0.7 kN/mm, respectively. These results confirm that the EP method reinforces the structure. The results of this study are expected to be used as basic data to reinforce deteriorated bridges in actual operation.