A New Reliability Analysis Model of the Chegongzhuang Heat-Supplying Tunnel Structure Considering the Coupling of Pipeline Thrust and Thermal Effect

考虑管道推力和热效应耦合的车公庄供热隧道结构可靠性分析新模型

阅读:1

Abstract

Based on the operating Chegongzhuang heat-supplying tunnel in Beijing, the reliability of its lining structure under the action of large thrust and thermal effect is studied. According to the characteristics of a heat-supplying tunnel service, a three-dimensional numerical analysis model was established based on the mechanical tests on the in-situ specimens. The stress and strain of the tunnel structure were obtained before and after the operation. Compared with the field monitoring data, the rationality of the model was verified. After extracting the internal force of the lining structure, the improved method of subset simulation was proposed as the performance function to calculate the reliability of the main control section of the tunnel. In contrast to the traditional calculation method, the analytic relationship between the sample numbers in the subset simulation method and Monte Carlo method was given. The results indicate that the lining structure is greatly influenced by coupling in the range of six meters from the fixed brackets, especially the tunnel floor. The improved subset simulation method can greatly save computation time and improve computational efficiency under the premise of ensuring the accuracy of calculation. It is suitable for the reliability calculation of tunnel engineering, because "the lower the probability, the more efficient the calculation."

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。