Research on advanced grouting curtain technology for water interception and control at the source of aquifer in coal seam roof

煤层顶含水层源头截水和控水先进注浆帷幕技术研究

阅读:4

Abstract

To solve the problem of safe mining of coal resources affected by the roof breccia aquifer, the author analyzed the scientific location, drilling technology, selection of grouting materials and applicability ratio, grouting pressure and other issues of underground grouting cutoff curtain wall construction, and analyzed and evaluated the grouting effect using water discharge test, drilling coring, drilling cuttings judgment and so on. The research results indicate that the migration range of slurry in both porous and fractured media increases with grouting time, but the growth rate gradually slows. In pore single fracture media, slurry migration preferentially enters the fracture channel and then diffuses along the direction of the fracture into the porous media; For cracks with small openings, pure cement slurry should be used. For karst-developed holes, fly ash can be added for non-pressure filling and injection. Cement slurry with mix proportions of 0.6, 0.7, 0.8, 0.9, water to solid ratios of 2.0, 1.0, 0.8, 0.6, and corresponding fly ash contents of 20%, 20%, 20%, 20%, and 30% can all meet the construction requirements; The minimum safe thickness for the construction of grouting curtain walls is 7.84 m, and the grouting pressure that meets the diffusion range and construction efficiency of the slurry is 4-6 MPa. After inspection of the inspection holes, the saturated compressive strength of the slurry stone body is 11.2 MPa, the water level difference between the inside and outside of the wall reaches 140m in 7 days, and the interception rate is above 86.51%. The interception effect of the wall is significant, meeting the design goals and requirements.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。