Techno-economic feasibility study of solar photovoltaic power plant using RETScreen to achieve Indonesia energy transition

利用RETScreen对太阳能光伏电站进行技术经济可行性研究,以实现印尼能源转型

阅读:1

Abstract

Indonesia, a key player in the global energy transition, faces surging electricity demand and ambitious renewable energy goals. In response, the government introduced a new regulation about renewable energy tariffs, including tariffs for photovoltaic (PV). However, there remains a gap in the academic literature regarding PV power plant feasibility studies under these tariffs. To address this gap, this study investigates the feasibility of a utility-scale solar photovoltaic (PV) power plant in Indonesia, focusing on the newly implemented renewable energy tariffs based on Independent Power Producers (IPPs) and Indonesia's state-owned electricity company (PLN) perspectives. Five scenarios were developed based on the proposed 26 MW solar power plant on Nias Island utilizing RETScreen software. The results showed that based on the IPP perspective, the newly implemented renewable energy tariff was inadequate to make the project feasible, however, an introduction of a 10 USD/t CO(2) emission incentive would make the project financially viable for IPPs. Therefore, it is recommended to introduce emission incentives as a strategic approach to attract investors and stimulate investment in Indonesia's PV power plants market, to accelerate Indonesia's energy transition. Conversely, the results also showed that the project is very profitable for PLN due to the significant cost-savings from the de-dieselization, leading to a reduction in the average generation cost for Nias.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。