Risk Evaluation Model of Highway Tunnel Portal Construction Based on BP Fuzzy Neural Network

基于BP模糊神经网络的高速公路隧道洞口施工风险评价模型

阅读:1

Abstract

Risk assessment for tunnel portals in the construction stage has been widely recognized as one of the most critical phases in tunnel construction as it easily causes accident than the overall length of a tunnel. However, the risk in tunnel portal construction is complicated and uncertain which has made such a neural network very attractive to the construction projects. This paper presents a risk evaluation model, which is obtained from historical data of 50 tunnels, by combining the fuzzy method and BP neural network. The proposed model is used for the risk assessment of the Tiefodian tunnel. The results show that the risk evaluation level is IV, slope instability is the greatest impact index among four risk events, and the major risk factors are confirmed. According to the evaluation results, corresponding risk control measures are suggested and implemented. Finally, numerical simulation is carried out before and after the implementation of risk measures, respectively. The rationality of the proposed risk evaluation model is proved by comparing the numerical simulation results.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。