To increase the efficiency of deep-hole blasting driving in mine rock tunnels, an innovative pattern of wedge cutting blasting with hole-inner delay was proposed. First, the blasting mechanisms of conventional and innovative wedge cutting patterns were theoretically investigated. The results showed that the resistance from large upper rock blocks and the clamping action from the surrounding rock were the major challenges of conventional cutting methods. For the innovative cutting pattern, under the conversion of the spatial distribution and release sequence of blasting energy, the first blasting of the upper charge can strengthen the breaking of the upper rock mass and create a new free surface, which provides favorable conditions for the delayed blasting of the bottom charge. Second, finite element models of two cutting patterns were established and solved, and the simulation results visually revealed the propagation of a stress wave. Critically, the stress strength in the upper cavity increased by 66-83% under the action of the upper charge, which was conducive to the breaking of the upper rock mass and the generation of a new free surface. Therefore, the rock mass in the bottom cavity can be readily broken and discharged. Ultimately, field applications were executed in a rock tunnel. Compared with a conventional cutting pattern, the proposed innovative cutting pattern can prominently increase the cycle advance and hole utilization and greatly reduce the unit consumption of explosives and detonators. This research confirms the usability of the innovative wedge cutting pattern with hole-inner delay in deep-hole blasting driving of rock tunnels.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。