Study on dynamic response and long-term settlement of silty soil around Shanghai metro tunnel

上海地铁隧道周围粉质土动力响应及长期沉降研究

阅读:1

Abstract

At present, the method for calculating long-term tunnel settlement predictions under metro loading considers only one working condition of passenger loading, which is inconsistent with actual working conditions. To establish a tunnel settlement model that accounts for variations in passenger flow, this study uses data mining methods to categorize metro operation into three working conditions: "peak period, secondary period, and low period." The impact of these passenger flow conditions on the dynamic response of the soil around the tunnel is analyzed. Then, based on the principles of calculus, a calculus-based prediction model is established to consider the changing patterns of metro passenger flow. The model is applied to analyze the long-term settlement characteristics of Shanghai Metro Line 10. The results indicate that, under identical conditions, soil displacement and dynamic deviatoric stress around the tunnel increase with passenger capacity. The calculus prediction model aligns more closely with actual working conditions than the conventional model. The predicted tunnel settlement of Shanghai Metro Line 10 after 20 years of operation is approximately 37.07 mm, with most settlement occurring in the early stages, primarily due to cumulative plastic deformation of the soil.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。