Subway tunnels displacement analysis due to two different communication channels construction procedures

地铁隧道位移分析,考虑两种不同的通信通道施工程序

阅读:1

Abstract

Due to congestion in overground space, many underground structures have been built to facilitate communications between cities. These structures constructions will induce soil displacement, cities planning rearrangement, and sometimes are near to future buildings constructions. In some cases, communication channels should be built to allow the underground junction between the building and the subway station. Numerical simulation has been carried out to study the tunnel displacement behavior during construction stages. Two different procedures of the communication channel construction were also investigated. The results reliability were evaluated by monitoring six points displacement in the sheet pile walls after completion of the foundation pit. The results obtained were reasonably close to the monitoring results proven reasonably of the research ideas and the method scientificity. The results showed using sheet piles walls, and struts before soil excavation could reduce considerably the lateral displacement of the subway line during the excavation process and induce augmentation in the subway line vertical displacement. The lateral displacement effect of the walls thickness variation is much superior to the one provides by the struts cross-section and pile's diameter variations.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。