Evaluation of the relationship between the collapsed mechanism and excavation method in tunnels excavated in schists

对片岩隧道开挖中坍塌机制与开挖方法关系的研究

阅读:1

Abstract

The problems experienced in tunnels excavated under high cover in graphitic schists generally vary according to the squeezing mechanism. During the tunnel excavation, slips occur on the slickenside surfaces in the tunnel face from time to time and collapse occurs. Most of the time, failures in the support systems are observed due to the squeezing mechanism in the long term in the sections whose tunnel excavations have been completed. In addition, if tunnel excavations are carried out from both entrance faces, it is possible to encounter excessive deformations at the junction points of the tunnels. Especially on weak ground, the importance of the distances between the stages increases in the case of opening the tunnels in the form of top heading, bench, and invert gradually. As a tunnel excavation method, excavation in stages directly affects the stability of the tunnel. Within the scope of this study, the collapsed mechanism in the junction area of the tunnels of the T6 tunnel is examined. For this purpose, 3-dimensional numerical analysis are performed with the Flac3d program. Analysis results are compared with site deformation measurements. As a result, an excavation methodology is proposed for the junction area of tunnels in weak ground.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。