Development and experimental validation of analytical models for water and mud inrushes through a filled karst conduit

建立并实验验证了充填喀斯特管道中水和泥浆涌入的分析模型。

阅读:1

Abstract

Water or mud inrush has become a common geological disaster during tunnel construction in karst areas. To study forming process and mechanism of water and mud inrushes through a filled karst conduit, water inrush and mud inrush model tests were carried out with a self-developed 3D model test system. The results show that the forming processes of water inrush and mud inrush have different forming modes. For water inrush, the forming process follows: flowing instability of filling material particles-formation of water inrush channel-water inrush occurring; while for mud inrush, the forming process follows: stability-sliding instability of the whole filling material suddenly-mud inrush occurring. Accordingly, a local instability model of critical hydraulic pressure causing water inrush and an integral sliding instability model of critical hydraulic pressure causing mud inrush were established respectively. The two analytical models reveal the mechanism of water inrush and mud inrush experiments to an extent. The calculated critical hydraulic pressures for water inrush and mud inrush are in good agreement with the test results. The distinguishment of water inrush and mud inrush through a karst conduit was discussed based on the critical hydraulic pressure and the evolution law of seepage water pressure in tests, and a criterion was given. The research results might provide guidance for the forecast of water and mud inrush disasters during the construction of tunnels in karst area.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。