Analytical solution of overlying pipe deformation caused by tunnel excavation based on Pasternak foundation model

基于帕斯捷尔纳克地基模型的隧道开挖引起的上覆管道变形的解析解

阅读:1

Abstract

The existing tunnel construction causes stratum deformation, which in turn leads to additional deformation and internal force of the overlying pipeline, thus increasing the risk of pipeline accidents. Then, how to correctly calculate the deformation and internal force of pipeline is the key to pipeline safety evaluation. To this end, this study firstly used the Pasternak foundation beam model to simulate the interaction of pipeline and soil, and divided the pipeline into the void area (i.e., pipeline-soil detachment) and the coordination area (i.e., pipeline-soil is always deformed together) between pipeline and soil. The differential equation of pipeline deflection for the void area and the coordination area were established respectively, and the solutions of pipeline deflection, the internal force of pipeline and the width of pipeline-soil void area were presented. Subsequently, the accuracy of the proposed method was verified by comparing with the available model and field test data, and it is found that the calculation results are too conservative without considering the pipeline-soil voiding phenomenon. Finally, the detailed parametric analysis was conducted. The results show that the pipeline deflection decreases with the increase of the pipeline-tunnel spacing between pipeline and tunnel, the pipeline bending stiffness and the soil elastic modulus, but increases with the increase of the formation loss rate, and the width of pipeline-soil void area increases with the increase of the pipeline-tunnel spacing, the pipeline bending stiffness and the soil elastic modulus.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。