Numerical simulation of roof cavings in several Kuzbass mines using finite-difference continuum damage mechanics approach

采用有限差分连续损伤力学方法对库兹巴斯多个矿山的顶板垮落进行数值模拟

阅读:1

Abstract

An essential stage of mine design is an estimation of the steps of the first and periodic roof caving in longwall mines. Generally, this is carried out using the field experience and can be much enhanced by numerical simulation. In this work, the finite-difference method was applied coupled with the continuum damage mechanics (CDM) approach to simulate the stress-strain evolution of the rock mass with the underground opening during coal extraction. The steps and stages of roof caving were estimated relying on the numerical simulation data, and they were compared with the field data from several operating mines in the south of the Kuznetsk Basin, Russia. The dependence of the first roof caving step in simulation linearly correlates with field data. The results correspond to the actual roofs of longwall panels of the flat-dipping coal seams and the average rate of face advancement is approximately 5 m/day.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。