Evaluation of Enterprise Green Mine Construction Based on DPSIR Model

基于DPSIR模型的企业绿色矿山建设评价

阅读:1

Abstract

As a new mode of mining development, green mine optimizes the development and utilization of mineral resources with a minimum of the environmental impact, and how to objectively evaluate the construction level of the green mine has become the key to promote green mine construction and it has also been an important path to achieve sustainable development of mineral resources. The evaluation system and methods of green mine construction, however, are not perfect at present as the existing green mine evaluation mostly adopts the index scoring accumulation method, with which the internal relations between the indicators are ignored, and the subjective influence it causes is too large. Based on the framework model of driving forces, pressure, state, impact and response, an indicator system is constructed in this paper to express the internal relationship between indicators more intuitively. Combined with subjective and objective combination weighting method to determine the index weight, TOPSIS and coupling coordination degree models are introduced to quantitatively evaluate the spatio-temporal evolution process of green mine construction and the coupling coordination between subsystems, analyze and obtain the main obstacle factors affecting the green mine construction of enterprises, and provide suggestions and countermeasures for the improvement of green mine construction of enterprises. The applicability of the model is verified by an actual case study of a mine in China. The model enriches the connotation of green mines, making the evaluation process and results fairer and more reliable, thus providing an effective way to promote the sustainable development of mines.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。