Assessing the Land Reclamation Suitability of Beam Fabrication and Storage Yard in Railway Construction: An AHP-MEA Method

铁路建设中梁体制造和堆场土地复垦适宜性评估:一种AHP-MEA方法

阅读:1

Abstract

Railway construction contributes to socio-economic development but causes the occupation and destruction of land resources. How to effectively restore the temporary land and achieve efficient and rational reuse therefore becomes particularly important. The beam fabrication and storage yard (BFSY), as a large temporary facility during railway construction, occupies a large area of land. However, BFSYs damage the land in the way of pressing and may harden the ground to a high degree due to the use of high-density pile foundations, adversely affecting the soil properties. Therefore, this research aims to develop a model for evaluating the land reclamation suitability (LRS) of BFSY. The LRS evaluation indicator system of BFSY was firstly constructed based on the literature review and expert interviews. Then, an indicator-based model for assessing the LRS of BFSY was developed by integrating the analytic hierarchy process (AHP) model and the matter-element analysis (MEA) model. A case project in China was chosen to demonstrate and validate the developed model, and results show that the proposed model can rationally evaluate the LRS of BFSY in railway construction. The findings of this research enrich the knowledge system of sustainable railway construction and guide construction managers to conduct practical suitability assessments of land reclamation.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。