A cost-analysis of conducting population-based prevalence surveys for the validation of the elimination of trachoma as a public health problem in Amhara, Ethiopia

对在埃塞俄比亚阿姆哈拉州开展基于人群的患病率调查以验证沙眼作为公共卫生问题是否已消除进行成本分析

阅读:2

Abstract

BACKGROUND: Trachoma prevalence surveys, including impact surveys (TIS) and surveillance surveys (TSS), provide information to program managers on the impact of the SAFE (surgery, antibiotics, facial cleanliness, and environmental improvement) strategy and current burden of disease, and they provide a crucial component of the evidence base necessary for the validation of the elimination of trachoma as a public health problem. The prevalence surveys included in this analysis are multi-level cluster random surveys that provide population-based estimates for program planning. This study conducted an analysis of the cost of 8 rounds of TIS/TSS executed in Amhara, Ethiopia, 2012-2016, comprising 232,357 people examined over 1,828 clusters in 187 districts. METHODOLOGY AND FINDINGS: Cost data were collected retrospectively from accounting and procurement records from the implementing partner, The Carter Center, and coded by survey activity (i.e. training and field work) and input category (i.e. personnel, transportation, supplies, venue rental, and other). Estimates of staff time were obtained from The Carter Center Ethiopia. Data were analyzed by activity and input category. The mean total cost per cluster surveyed was $752 (standard deviation $101). Primary cost drivers were personnel (39.6%) and transportation (49.2%), with costs increasing in the last 3 rounds of TIS/TSS. CONCLUSION: Despite the considerable cost of conducting TIS and TSS, these surveys provide necessary information for program managers. Limited options are available to reduce the costs of TIS/TSS and gain economies of scale, as the surveys must be designed to achieve their designated sample size. However, surveys must also be designed in a way that is possible to be executed given the financial resources, personnel, and time required. Program managers can use these findings to improve estimates of the total cost of a survey and its components to ensure that sufficient resources are budgeted accordingly.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。