Numerical analysis and application of the construction method for the small interval tunnel in the turn line of metro

地铁转弯线小间距隧道施工方法的数值分析与应用

阅读:1

Abstract

The surrounding rock may become unstable or even fall down and the initial support may crack and be destroyed when the construction method of the underground excavation tunnel is not properly selected in the turn line of metro. . A section of the Santunbei turn line of Urumqi Metro Line 1# was taken as the engineering background. The proposed construction method was analyzed by numerical simulation. Numerical analysis shows that the final surface settlement caused by the proposed construction method is 3.0 mm and the horizontal convergence is 3.2 mm. It also turns out that the proposed construction method causes less deformation, and the method can be applied to the construction of the small interval tunnel in the Santunbei turn line of metro. The rationality of the method and numerical model was further verified by comparison between the monitored data of surface settlement, horizontal convergence and vault sinking, and numerical simulation results. Finally, the deformation and stress of the six construction methods were compared. The deformation and stress caused by the six construction methods are almost the same. It indicates that the construction spacing between the left and right tunnels does not affect the safety of tunnel construction. Therefore, the appropriate construction spacing could be selected according to the resource configuration, instead of deformation and stress.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。