Multilayer entropy-weighted TOPSIS method and its decision-making in ecological operation during the subsidence period of the Three Gorges Reservoir

多层熵加权TOPSIS方法及其在三峡水库沉降期生态运行决策中的应用

阅读:2

Abstract

Coordinating the downstream ecological demand and the power generation demand of hydropower stations is an important task in the operation of reservoirs, and how to evaluate the ecological satisfaction of the scheduling process is a difficult problem that needs to be solved urgently. A multi-objective optimal reservoir scheduling model was constructed to coordinate the spawning flow demand of " Four Major Chinese Carps"; The model takes the maximum power generation and the maximum membership degree of downstream river ecological water demand as the objective functions, and uses the dynamic programming multi-objective solution algorithm based on penalty factors to solve the problem, and obtains the non-inferior solution set in each scenario. The multilayer entropy-weighted TOPSIS method was used to study the non-inferior solution of the multi-objective scheduling model of the Three Gorges Reservoir, and the satisfactory solution ranking of the river flow rise process, ecological flow-related requirements, and power generation water requirements was obtained under the four schemes including 4d ~ 7d, which improved the reliability of the evaluation results and made up for the shortcomings of the traditional TOPSIS method in terms of hierarchy and weight science. The research results of this paper can provide a reference for decision-making on the ecological management of the spawning period of the " Four Major Chinese Carps" in the Three Gorges Reservoir of the Yangtze River.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。