Study on Spraying Construction Method of a Non-Water Reacting Polymer Layer in the Tunnel

隧道内非水反应聚合物层喷涂施工方法研究

阅读:1

Abstract

Non-water reacting double-component foamed polyurethane has been increasingly used in the field of transportation. Particularly, it is recognized that a polymer damping layer between tunnel linings and surrounding rocks can improve the seismic performance of tunnels. To facilitate the application of this polymer in tunnels, a spraying construction method of polymer damping layers was proposed. The polymer damping layer was prepared with hydraulic spraying equipment, and the construction process included the pre-treatment of the tunnel base surface, the pressure control of the spraying equipment, the adjustment of the spray gun working parameters and spraying quality control. In this paper, the effects of material ratio, material temperature, environmental factors (i.e., temperature, humidity and wind speed), spraying pressure and spray gun parameters (i.e., speed, distance from the sprayed surface and spray angle) on the layer formation were investigated. Thus, spraying parameters for better spraying performance were recommended. This study will provide technical support for polymer damping layer construction in the seismic design of tunnels.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。