Dual-objective optimization of prefabricated component logistics based on JIT strategy

基于准时制策略的预制构件物流双目标优化

阅读:2

Abstract

Prefabricated construction involves manufacturing components in a factory and then transporting them to a construction site for assembly, yielding resource savings and improved efficiency. However, the large size and weight of prefabricated components, along with strict delivery requirements, introduce logistical challenges, such as increased carbon emissions during transport and site congestion. This study addresses the dual-objective vehicle scheduling problem for prefabricated components. It proposes a dual-objective optimization model for prefabricated component logistics, guided by the Just-In-Time (JIT) strategy. The model comprehensively considers on-site and off-site logistics, accounts for uncertainties, and details the logistics process for each component. Its objectives are to reduce carbon emissions during logistics and enhance customer satisfaction. An improved Non-dominated Sorting Genetic Algorithm II (NSGA-II) is used to solve the model, offering enhanced solution diversity and local search capabilities. The model is validated through case studies, with sensitivity analyses conducted to further assess performance. Results indicate that the proposed model provides effective vehicle scheduling solutions that meet optimization objectives. Compared to traditional logistics models, the JIT logistics model demonstrates greater resilience to uncertainty, providing scientifically based decision support for logistics management in prefabricated construction.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。