The Burden of Surgical Cancellations and No-Shows: Quality management study from a large regional hospital in Oman

手术取消和爽约的负担:阿曼一家大型地区医院的质量管理研究

阅读:1

Abstract

OBJECTIVES: The operating theatre (OT) is a vital facility that utilises a considerable portion of the hospital's budget; thus proper OT utilisation is essential. Surgical cancellation is a leading cause of OT underutilisation. This study aimed to report the rate and reasons for surgical cancellations and no-shows in a large regional hospital in Oman. METHODS: This study took place as part of a retrospective quality management project at the Ibri Regional Hospital, Ibri, Oman. All elective surgical procedures scheduled between January and December 2014 were included. Cancelled procedures were reviewed to determine the reasons for cancellation. RESULTS: A total of 4,814 elective procedures were scheduled during the study period; of these, 1,235 (26%) were cancelled. Patient no-shows were the most prevalent reason for surgical cancellation (63%), followed by surgical reasons (17%); in contrast, OT-associated reasons were responsible for only 2% of cancellations. According to speciality, general surgery had the highest percentage of total cancellations (65%), while ear, nose and throat had the highest rate of surgical cancellations among their scheduled cases (42%). CONCLUSION: Ibri Regional Hospital had a higher surgical cancellation rate due to no-shows than those reported in the literature. Regular audits, quality management projects and the appointment of a dedicated procedure booking coordinator may enhance proper utilisation of the OT, potentially saving funds, conserving resources and alleviating the burden of cancellations.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。