Stochastic economic placement and sizing of electric vehicles charging station with renewable units and battery bank in smart distribution network

智能配电网中电动汽车充电站(含可再生能源单元和电池组)的随机经济选址和规模

阅读:3

Abstract

Placement and sizing of vehicle refueling station powered by battery and renewable wind, solar and bio-waste sources in smart distribution network is presented in this paper. It includes an electric vehicle charging station. Hybrid battery/renewable sources/vehicle station system is equipped with power electronic converter that is capable to control active and reactive power. Bi-level formulation for scheme is used. Upper level model includes vehicle refueling station planning. Its objective function minimizes the annual costs of construction, maintenance and operation of the aforementioned station. Constraints include the operation-planning model of renewable sources, battery bank, electric vehicle charging station considering reactive power management. Lower level problem expresses the economic operation of smart grid. Its objective function minimizes the sum of annual operating and energy loss costs in grid, which is constrained by linearized AC optimal power flow equations. Stochastic optimization models uncertainties of load, price of energy, renewable resources, and vehicle stations. Benders decomposition algorithm is used to extract the optimal solution. Numerical results indicate capability of design in the optimal location and sizing of vehicle refueling stations considering the improvement of economic and operation conditions of network. Construction of a station without renewable resources and batteries leads to an increase of 144.6% in grid operating costs and 167.6% in network energy losses. Voltage magnitude reaches a value less than 0.9 p.u. However, the proposed plan improves economic conditions of network by 51.3-74.5%, and network operation status is improved by about 17.7-148.1% compared to the construction of station without source and battery. In this condition, the planning cost of vehicle refueling station increases about to 88%.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。