Bottom-hole pressure drawdown management of fractured horizontal wells in shale gas reservoirs using a semi-analytical model

利用半解析模型管理页岩气藏裂缝性水平井的井底压力下降

阅读:2

Abstract

Due to strong stress sensitivity resulted from unconventional tight formationsit is of practical interest to formulate a reasonable pressure drawdown plan to improve gas extraction recovery. The impact of water-shale interactions on the reservoir permeability was previously ignored in the managed pressure drawdown optimization. The controlled-pressure production dynamic analysis was mostly conducted using numerical simulation, lack of rigorous theoretical support. Hence in this paper, a theoretical production prediction model was proposed and verified with HIS RTA 2015by incorporating multiple pressure drawdown mechanisms and various non-linear gas flow process. The on-site production effects dominated by two different pressure drop methods was further compared, indicating that compared to depressurization production, the production reversion can occur in the controlled pressure production process and the EUR of single well can be increased by about 30% under the control of managed pressure drawdown approach. Finally, the pressure drawdown optimization strategy was carried out on the field test from the both production effect and economic benefits, which demonstrated that the best economic solution can generally be obtained in the early stage of production. The research results can be closely linked to the on-site production practice of shale gas wells, providing insights into designing optimized production strategy scheme.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。