Prediction of Corrosion-Induced Longitudinal Cracking Time of Concrete Cover Surface of Reinforced Concrete Structures under Load

荷载作用下钢筋混凝土结构保护层表面腐蚀致纵向开裂时间的预测

阅读:1

Abstract

Reinforced concrete (RC) structures suffer from different types of loads during service life, and the corrosion characteristics of steel bars embedded in concrete under load are different from those under non-load. In this paper, when the interface between steel bars and concrete (IBSC) cracked and the concrete cover surface (CCS) cracked, the effects of load on the critical corrosion depth of steel bars were analysed based on the thick-walled cylinder model, and a prediction model for the corrosion-induced longitudinal cracking (CLC) time (i.e., initiation cracking time) of the CCS of RC structures under load was proposed. Finally, the influence of load on the CLC time of CCS was discussed on the basis of the proposed prediction model. The results showed that the load had a significant effect on the critical corrosion depth of steel bars when the IBSC cracked induced by corrosion, while the influence of load on the critical corrosion depth of steel bars when the CCS cracked induced by corrosion was not obvious. When the CCS cracks induced by corrosion under load, the influence of the rust-filling layer on the critical corrosion depth of steel bars was larger than that of the load. With the increase in load, the CLC time of CCS decreased. The calculated values of the proposed prediction model were in reasonable agreement with the experimental values, which can provide a reference for durability evaluation and service life prediction of RC structures and lay the foundation for the investigation of the corrosion depth of steel bars in concrete under load.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。