Fusing multiple source data for foundation excavation risk assessment based on cloud model and Dempster Shafer evidence theory

基于云模型和邓普斯特-谢弗证据理论的融合多源数据进行地基开挖风险评估

阅读:2

Abstract

Limited data from single source pose a significant constraint on the accuracy of risk assessment conducted during the pre-excavation feasibility analysis stage. In order to address this issue, a risk assessment method that integrates cloud model (CM) with Dempster-Shafer (D-S) evidence theory is proposed. This method carefully selects multi-source risk evaluation indicators from project information and three-dimensional finite element numerical results to create project database and numerical database. By leveraging these databases, the CM generates the membership degrees for various evaluation indicators across different risk levels, which are then transformed into basic probability assignments within the D-S evidence theory. This allows for effective fusion of multi-source risk evaluation indicators achieving comprehensive quantitative evaluation of excavation. A narrow and elongated foundation project is assessed with a risk level of IV (safety) by the proposed approach. The outcomes provide a scientific basis for formulating preventive strategies and managerial decisions about foundation excavation during the pre-excavation.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。