Numerical simulation method for double shield TBMs crossing weak zones

双盾隧道掘进机穿越薄弱带的数值模拟方法

阅读:1

Abstract

Deformation and collapse of the surrounding rock, leading to machine jamming, are critical factors hindering the safe and efficient operation of Double Shield Tunnel Boring Machines (DS TBMs). Machine jamming can be categorized into shield jamming and cutterhead jamming, each influenced by various factors. Numerical simulation effectively quantifies the impact of these factors. This paper examines the calculation methods for thrust resistance and cutterhead torque in DS TBMs and proposes a numerical simulation method that accounts for their tunneling process. A finite difference model of DS TBM excavation in rock with weak zones was developed in FLAC3D, incorporating interactions between the surrounding rock, TBM cutterhead, and shield. A Python program was created to extract stress data from individual shield and cutterhead elements, allowing for a precise quantitative assessment of potential jamming. The proposed numerical simulation method was validated for its accuracy and applicability through the analysis of a shield jamming incident at the K10 + 242 section of the DXL tunnel.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。