Building a Covid-19 secure intensive care unit: A human-centred design approach

构建新冠肺炎安全重症监护病房:以人为本的设计方法

阅读:1

Abstract

BACKGROUND: The Covid-19 pandemic has highlighted weaknesses in the National Health Service critical care provision including both capacity and infrastructure. Traditionally, healthcare workspaces have failed to fully incorporate Human-Centred Design principles resulting in environments that negatively affect the efficacy of task completion, patient safety and staff wellbeing. In the summer of 2020, we received funds for the urgent construction of a Covid-19 secure critical care facility. The aim of this project was to design a pandemic resilient facility centred around both staff and patient requirements and safety, within the available footprint. METHODS: We developed a simulation exercise, underpinned by Human-Centred Design principles, to evaluate intensive care designs through Build Mapping, Tasks Analysis and Qualitative data. Build Mapping involved taping out sections of the design and mocking up with equipment. Task Analysis and qualitative data were collected following task completion. RESULTS: 56 participants completed the build simulation exercise generating 141 design suggestions (69 task related, 56 patient and relative related, 16 staff related). Suggestions translated to 18 multilevel design improvements; five significant structural changes (Macro level) including wall moves and lift size change. Minor improvements were made at a Meso and Micro design level. Critical care design drivers identified included functional drivers (visibility, Covid-19 secure environment, workflow, and task efficiency) and behavioural drivers (learning and development, light, humanising intensive care and design consistency). CONCLUSION: Success of clinical tasks, infection control, patient safety and staff/patient wellbeing are highly dependent on clinical environments. Primarily, we have improved clinical design by focusing on user requirements. Secondly, we developed a replicable approach to exploring healthcare build plans revealing significant design changes, that may have only been identified once built.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。