Consideration of factors of low accrual and methods for setting appropriate accrual periods: Japan Clinical Oncology Group study

考虑入组率低的原因及设定适当入组期的方法:日本临床肿瘤学组研究

阅读:2

Abstract

BACKGROUND: Poor patient accrual can delay reporting of clinical trials and, consequently, the development of new treatments. For reducing the risk of additional resource requirements, a method for setting planned accrual periods with minimal deviation from the actual accrual periods is desirable. Risk factors for poor patient accrual and the appropriate method of estimating the required accrual period for timely completion of clinical trials were evaluated using the data of trials conducted by the Japan Clinical Oncology Group. METHODS: The study included 199 trials that started patient accrual between January 1, 1990, and June 30, 2021. The explanatory variables included factors that could be evaluated prior to trial commencement. We also evaluated whether the estimation methods for accrual pace could lead to completion within the planned accrual period. RESULTS: Approximately 23.6% of trials were completed within the planned accrual period. The risk factors for trial extension included planned accrual periods > 3 years (reference group: ≤ 3 years, odds ratio [OR] 0.37, 95% confidence interval [CI]: 0.15-0.92, P = 0.033) and stratified trial design (reference group: nonrandomized phase II trials, nonrandomized phase III trial [OR: 3.28, 95% CI: 0.99-10.9, P = 0.051], randomized phase II trial [OR: 3.91, 95% CI: 0.75-20.30, P = 0.105], and randomized phase III trial [OR: 9.29, 95% CI: 3.39-25.40, P < 0.001]). The method of estimating the accrual pace based on past clinical trials facilitated timely completion of the trial (OR: 3.51; 95% CI: 1.73-7.10, P < 0.001), unlike the estimation method based on survey evaluation of the accrual pace for participating institutions (OR: 1.12, 95% CI: 0.56-2.26, P = 0.751). Furthermore, the discrepancy between planned and actual accrual periods was minimal when using the methods of considering the accrual pace of past clinical trials. CONCLUSIONS: Considering the accrual pace of past clinical trials is useful for estimating the required accrual period if data from past trials are available. When conducting a survey, it is necessary to be cautious of overestimating the cases at each facility.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。