Deformation and force analysis of reinforced soil Bridge abutment under dynamic vehicle loading

动态车辆荷载作用下加筋土桥台的变形和受力分析

阅读:1

Abstract

The Geosynthetic Reinforced Soil-Integrated Bridge System (i.e. GRS-IBS) was developed to address the bumping issue from differential settlement at bridge abutments. This study focused on a Louisiana bridge abutment, using numerical simulation with the finite difference method to assess deformation and stress under dynamic loads. Results showed that deformation of the soil abutment and geogrid increased with the vehicle weight, with a more pronounced effect on lateral displacement than settlement. Settlement values initially decreased then rose with speeds between 30 and 60 km/h, mirroring the trend in lateral displacement and geogrid deformation. The lateral displacement of the geogrid was roughly half that of the panel. Shear stress on the abutment at 5 tons was double that at 1.75 tons, and geogrid stress was triple. Analysis indicated that a vehicle speed of around 45 km/h had the least impact on the reinforced soil abutment. The findings offer valuable insights for the use and maintenance of reinforced earth bridge abutments.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。