Hydrological dynamics of the Yangtze river-Dongting lake system after the construction of the three Gorges dam

三峡大坝建成后长江-洞庭湖水系的水文动态变化

阅读:1

Abstract

The Yangtze River-Dongting Lake link has gotten a lot of attention as a because of the Three Gorges Project. However, the hydrological dynamic process and future direction of the river-lake interaction in the context of sediment reduction are yet unknown. Based on Dongting Lake Basin runoff and sediment data from 1961 to 2020, as well as field monitoring data of turbidity and flow velocity from Yichang to Chenglingji section of the Yangtze River, this paper examines the runoff and sediment variation law and hydrological dynamic process of Chenglingji, the only outlet connecting Dongting Lake to the Yangtze River, and reveals the development trend of the river-lake relationship. After absorbing high-concentration material from Dongting Lake, Chenglingji's turbidity and energy per unit water body alter dramatically. When the high-speed flow from the mainstream of the Yangtze River and the gentle flow of Dongting Lake pass through the "deep trough" of Chenglingji, the two streams of high and low flow velocity intersect and decelerate to dissipate energy, and the flow structure becomes more complicated. Dongting Lake has experienced three stages: deposition (1961-2007) -erosion (2008-2017) -deposition (2018-2020). The river-lake relationship will tend to a new dynamic equilibrium state in the future.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。