Abstract
To address the prominent problem of early rutting distress in asphalt pavements under heavy-load traffic in China, this study proposes a composite modifier consisting of direct coal liquefaction residue (DCLR), styrene-butadiene-styrene block copolymer (SBS), and styrene-butadiene rubber (SBR). The preparation process and formula were optimized through single-factor experiments and orthogonal tests. Systematic investigations were conducted on its conventional performance, water damage resistance, aging resistance, fatigue performance, rheological properties, and microscopic mechanism, with comparisons made against base asphalt, single DCLR-modified asphalt, SBS-modified asphalt, and SBS/SBR-modified asphalt. The results indicate that the optimal preparation process for the novel composite high-modulus modified asphalt is as follows: DCLR particle size of 0.3 mm, addition in molten state, shear temperature of 170 °C, shear rate of 5000 r·min(-1), shear time of 50 min. The optimal formula is 10% DCLR + 3% SBS + 2% SBR + 3% compatibilizer, with the addition sequence of "DCLR → SBS + compatibilizer → SBR". This asphalt exhibits a softening point of 77.8 ± 2.1 °C, a Brookfield viscosity at 135 °C of 1.928 ± 0.105 Pa·s, and a grading of 5 for adhesion to aggregates; the rutting factor at 64 °C reaches 10.8 ± 0.9 kPa (6.43 times that of the base asphalt), the creep stiffness at -12 °C is 136 ± 12.5 MPa, and the low-temperature limit temperature is -17 °C; the freeze-thaw splitting strength ratio (TSR) is 94.6 ± 1.8%, and both aging resistance and water damage resistance are significantly superior to those of the control group asphalts (p < 0.05). The novel composite high-modulus modified asphalt showed improved overall laboratory performance and may be suitable for heavy-load traffic and complex climatic conditions, however, field validation is needed.