Optimization of ore production scheduling strategy using NSGA-II-GRA in open-pit mining

基于NSGA-II-GRA的露天矿矿石生产调度策略优化

阅读:1

Abstract

To address the challenges posed by ore grade fluctuations, extraction cost variations, and market price instability in open-pit ore production strategies, an optimization model integrating a solution algorithm integrating dynamic simulation is proposed. First, Monte Carlo simulation is used to generate random variables, simulating ore grade and extraction cost fluctuations at different extraction points. Then, the Non-dominated Sorting Genetic Algorithm II with Grey Relational Analysis (NSGA-II-GRA) is employed for an initial solution to obtain the preliminary Pareto-optimal solution set. Furthermore, a market price fluctuation constraint equation is introduced during the optimization process to conduct a second iterative optimization of the initial solution set, generating optimized plans under different price fluctuation intervals. Finally, by integrating subjective and objective weights, the weighted grey relational analysis method is applied to select the optimal Ore Production Scheduling Strategy. The optimization results indicate that, while achieving the optimization objectives, calcium oxide grade and production target achievement rate increased by 7% and 7.17%, respectively, while ore output increased by 16.7% and 20.5% under different price fluctuation intervals.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。