Research and design experience of a 1 million tons/year CO(2) capture project in the Shengli oilfield of Qilu petrochemical

齐鲁石化胜利油田年产100万吨二氧化碳捕集项目的研发设计经验

阅读:1

Abstract

This study presents a comprehensive overview of a pioneering 1 million-ton carbon capture, utilization, and storage (CCUS) project implemented in the Qilu Petrochemical Shengli Oilfield in China. The project involved a compression-condensation-purification process and aimed to capture CO(2) from the coal gas of the second chemical fertiliser plant of the Qilu Petrochemical Company. Molecular sieves were used to dry the captured CO(2), and MellapakPlus™ structured packing was employed for purification. Two novel energy-saving processes were implemented, a lithium bromide refrigerator unit to recover waste heat for cooling and an expansion generator unit to recover pressure energy from the tail gas. The project layout and land area were carefully determined. The consumption of utilities in the capture system was analysed. Furthermore, an economic assessment of the project was conducted. The technical and economic feasibility of this project was confirmed by the findings. The comprehensive energy consumption per unit of the capture process was 2.649 GJ/t CO(2), the total investment (excluding tax) for CO(2) capture was CNY 380 million (380 CNY/t CO(2)), the payback period of the project was 9.20 years, and the sales price (excluding tax) of the project was 194.4 CNY/t CO(2) at a yield of 8%.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。