Research on tugboat scheduling optimization model considering the reliability of tugboat matching scheme

考虑拖船匹配方案可靠性的拖船调度优化模型研究

阅读:1

Abstract

The selection and scheduling of tugboat matching schemes are key tasks in tugboat assistance operation management. With large ships requiring more tugboat assistance, a two-stage multi-criteria decision-making method is proposed. This includes a normal distribution-based multi-attribute group decision-making method with triangular fuzzy numbers to determine tugboat matching scheme reliability. A tugboat scheduling planning model for multiple berthing bases is then established, targeting the minimization of total fuel cost and total matching scheme reliability. This bi-objective problem is solved using the posteriori method, with actual data from Nansha Port validating the proposed method. Meanwhile, a priority-based encoding Memetic algorithm is designed to address the characteristics of the problem, and the solution results for 25 test cases generated from the actual data range of the Guangzhou Port are compared and analyzed using CPLEX, genetic algorithms, and simulated annealing algorithms. The results verify the feasibility of the proposed priority-based encoding Memetic algorithm. The enhanced multi-attribute group decision-making method helps decision-makers quickly select suitable matching schemes and optimize tugboat scheduling, demonstrating effective reliability evaluation and planning optimization.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。