DSCostPred: a double-stacking model for construction cost prediction

DSCostPred:一种用于建筑成本预测的双层堆叠模型

阅读:1

Abstract

The prediction of construction project cost plays a core role in engineering construction projects. However, the current prediction involves a multi-dimensional and dynamically variable system, and each major category can be further subdivided into many specific factors. Meanwhile, variables' relationships present a complex network of nonlinearity and interaction, which seriously affected the prediction accuracy. To solve this problem, we proposed a dual-stacking construction cost prediction method based on variable stacking and model stacking (DSCostPred). This method emphasizes that classifying variables and applying different algorithms respectively can avoid the impact of variables' functional differences. First, the variables are pre-classified to avoid mutual interference among them. Then, to learn the attribute and function positioning, as well as the complex interaction among them, different types of models are utilized to learn the variables. In algorithm design, to achieve the organic combination of multiple attributes and multiple models, a variable stacking is introduced into stacking ensemble learning to form collaborative predictions with model stacking. This method was compared with the classical method on real data, and the results show the superior performance. In addition, the ablation experiments and SHAP analysis also demonstrated the feasibility of the double-stacking idea we proposed.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。