Mechanism and control of floor heave in two entry retained roadways using dense boreholes

利用密集钻孔研究双入口挡土巷道底面隆起的机理及控制方法

阅读:1

Abstract

This study addresses severe floor heave in retained entries of two-entry longwall faces through a case analysis of Chahasu Coal Mine, China. Surrounding rock deformation and failure in the 31,317 tail entry were characterized through field monitoring and laboratory tests, followed by analysis of geological and mining impacts on floor heave. Stress evolution in the coal pillar between entries during mining was examined through 3DEC numerical simulations, revealing floor heave mechanisms. Support strengthening and stress improvement measures were comparatively evaluated. A dense borehole roof-cutting technology (CRDBDCS) was developed for floor heave control, with key borehole parameters optimized. When implemented in the 31,315 head entry and adjacent roadways, an over 87% reduction in floor heave volume was achieved, enabling entry reuse. The effectiveness of CRDBDCS was thereby demonstrated, providing technical support for the safe and efficient operation of coal mine roadways.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。