This article uses the engineering background of the Zhengzhou Metro Line 5 with a cement-soil group pile composite foundation. It simplifies the composite foundation using the area-weighted composite modulus method and establishes a finite element model of a double-line EPBM passing beneath the cement-soil group pile composite foundation building. The calculation results were compared and validated against monitoring data. Based on this, the simplified model was used to analyze the effects of face pressure and grouting pressure on the settlement of the upper structure. The research results indicate that the numerical simulation curves of settlement at monitoring points F17, F16, F15, and F14, where the shield axis intersects the building plane, align well with the monitored values, thereby confirming the rationality of the simplified model. Additionally, appropriately increasing the face pressure and grouting pressure is beneficial in suppressing the settlement of the upper structure; however, when the face pressure increases to 0.20 MPa and the grouting pressure increases to 0.35 MPa, the suppressive effect significantly diminishes.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。