Grouting failure mechanism and new pre-grouting reinforcement technology of narrow coal pillar in fully-mechanized caving gob-side entry

全机械化垮落式采空区巷道窄煤柱注浆失效机理及新型预注浆加固技术

阅读:1

Abstract

With the wide application of large machinery in coal mining, the influence of mine pressure is large and wide. Therefore, it is very important to retain and maintain the strength of coal pillars in the working face section. But the traditional narrow coal pillar grouting technology often causes grouting failure due to slurry leakage. In order to avoid this situation, the pre-grouting solidification technology is put forward. Through theoretical analysis and speculation, numerical simulation, field test and monitoring and other methods, this article discusses the shortcomings of traditional grouting methods, the causes of grouting failure, and the reasons for grouting failure, the characteristics of fracture distribution in narrow coal pillar, the concrete implementation method of pre-grouting solidification technology and the reasonable selection of grouting time. The results show that the high fracture development within the narrow coal pillar has good grouting permeability, and the coal pillar is pre-grouting reinforced before the excavation of the roadway along the goaf, combined with the flexible thin-layer shotcrete layer and reasonable grouting time, the solidification of narrow coal pillar has achieved good results, and has constructed a good surrounding rock environment for excavation and support of roadway.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。